Saling of construction equipment and tools = Quality and services for your success:
»optimal price-performance ratio »reliability and flexibility »technical knowledge and competent consulting »centrally located in the heart of the ruhr area
Mon |
08:00 |
- |
12:00 |
Tue |
08:00 |
- |
12:00 |
Wed |
08:00 |
- |
12:00 |
Thu |
08:00 |
- |
12:00 |
Fri |
08:00 |
- |
12:00 |
Sat | Closed |
Sun | Closed |
can be shipped within 2-5 days
with CEE plug 63 A 2 m heavy rubber hose line H07RN-F 5G16
MIXO electricity meters only use roller counters that comply with the specifications of the calibration supervisory authority. To ensure that the measured values are recorded correctly, insert the electricity meter between the power source and the consumer. Electricity metering begins as soon as the load is switched on. For correct readings, insert the electricity meter between the power source and the load. The electricity meter starts as soon as the consumer is switched on.
400 V, 63 A, 5-pole, approx. 43 kW